Trendspek, in partnership with Applus+, Egis Middle East and VSL, recently supported digital-led assessments of the 25km King Fahd Causeway bridge, a landmark structure connecting Saudi Arabia and Bahrain, giving global teams remote access and a full picture of the bridge’s health.
3D Precision Reality Twin created in 24hrs
Removed safety risk of physical inspections
Millimetre accuracy from millions of data points captured
Complete digital assessment within days
Background
Removing the need for multiple teams to fly in to physically manoeuvre around the bridge, Trendspek provides an interactive platform with high-fidelity 3D models, digital workflows and interactive reporting to give global teams remote access and a full picture of the King Fahd Causeway’s structural health.
Solution implemented
Trendspek is a leading 3D Structural Lifecycle Management software platform, allowing engineers and asset owners to virtually assess, manage and monitor infrastructure with powerful data to make evidence-led decisions, anywhere in the world. The platform enables streamlined digital reporting, investigation and remediation of assets, providing superior outcomes when compared with traditional methods, such as physical assessments, which can take up to 12 months to complete.
Outcome delivered
Once their partner had scanned the bridge, Trendspek delivered an exact digital replica with millimetre detail, a Precision Reality Twin, to allow relevant project stakeholders to complete a digital assessment in days, empowering specialist engineers in over 7 countries.
This enabled the global workforce to collaborate online to generate a full interactive condition report, target areas for investigation, and develop maintenance plans to ensure the ongoing longevity and safety of the structure.
About Trendspek
Trendspek’s Structural Lifecycle Management (SLM) software digitises inspections, defect reporting, and monitoring workflows, enabling real-time collaboration between owners, operators, and engineers to manage structures proactively.
For more information, visit https://trendspek.com/.
Source: Trendspek 2024
View More Project Case Studies
Mirvac and SPACECUBE – Relocatable sales display suite delivers sustainable value
Modular display suite relocated and reused across two Mirvac developments, enabling faster delivery, reduced waste, and a premium customer experience.
Landsec and Social Value Portal – Embedding social value assessment across real estate development
Landsec partnered with Social Value Portal to integrate measurable social impact into its real estate development lifecycle, driving community benefit and long‑term value creation.
Lexus and SPACECUBE – Three‑level hospitality pavilion delivered with speed and sustainability
Spacecube delivered a premium modular pavilion for Lexus’s LANDMARK by Lexus experience at the Melbourne Cup Carnival, combining rapid build, architectural quality, and future reuse potential.
University of Sydney and Trendspek – Digital‑first asset management for 100+ university campus buildings
Trendspek partnered with the University of Sydney and Infracorr to digitally capture and assess 110 buildings, enabling fast, comprehensive inspections and proactive lifecycle planning across the Camperdown campus.
Khansaheb and Ampd Energy – Batteries replace diesel generators on construction sites in Dubai, saving 85% on carbon
Khansaheb has become the first contractor in the GCC to use a battery energy storage system (BESS) to power large construction equipment, implementing BESS to power tower cranes and replace diesel generators on construction sites.
Microsoft and Ampd Energy – Construction site batteries power lower-carbon data centre development
Ampd Energy’s battery energy storage systems (ESS) enabled significant diesel and emissions reductions during construction of a Microsoft sustainable data centre in Victoria, Australia.